Partnership — ADELE ENERGY

We build turnkey charging station networks and are open to partnerships with businesses, vehicle fleets and site operators.

Drawing on our experience and deep expertise, we have successfully installed more than 250 charging stations, earning a reputation as a reliable partner in the shift to clean, sustainable transport.

For location owners

Shopping centres, hotels, parking facilities, filling stations and business centres. We either install the stations and share revenue, or sell the equipment with full support.

e-Mobility consulting

Expert review of your business model, selection of the optimal equipment and technical support

EV charging station service and installation

Our team has hands-on experience building turnkey charging infrastructure with integration into a payment processing provider.

Distribution

Supply of equipment from our own production as well as from global brand partners, with the necessary service support and integration.

Payment acceptance setup

Connecting your stations to the app, with access to our existing customer base.

White-label

Development of a dedicated mobile app for your company against an agreed specification.

Fibre optics

Fibre-optic cable laying and connection of the relevant equipment. (Case study: over 25 km of fibre laid at Arkalyk Airport)

How we bring a site online

Four stages — from the first conversation to a fully operational station.

Site audit

We review available power capacity, traffic flow and space for the stations.

Design & estimate

We prepare a cost estimate, a connection plan and a utilisation forecast with payback figures.

Installation

We install the equipment, connect it to the grid and bring it live in Adele Cloud.

Operations

We maintain the stations, monitor utilisation and grow the site together with you.

Who we work with

Choose the type of site — the details are right here, no need to leave the page.

Residents with electric cars need charging in the car park. Here is what it takes.

We start by looking at the site

Every residential complex is different: we come to the site, look at the car park layout and the state of the electrics. Our priority is to install in a publicly accessible area so that valuable parking spaces are not taken away from residents.

We ask for technical conditions with reserve

In practice we ask for technical conditions with a power reserve — at least 60 kW. That makes it possible to increase capacity as the number of electric cars grows, without rebuilding the incoming supply.

Which stations we install

The most in demand in residential complexes are stations with two 7 kW connectors. For alternating current at a site like this that is enough: the car stands overnight and there is no rush. The station mounts on a wall or a stand and suits European cars with Type 2 connectors.

How many stations are needed

We usually start with one or two stations: 15–30 kW in total, that is two to four parking spaces at 7 kW each. After that we look at the usage statistics and add stations where the layout allows.

Read in detail →

Charging keeps a customer in the mall for another hour. Here is what it takes.

One station, one connector

A shopping centre is better served by a single-connector station up to 90 kW, with 40–60 kW being optimal. The driver leaves the car while shopping and it charges within an hour or so.

A hybrid solution

If the flow varies, we build a hybrid: one fast station and one slow at 7 + 7 kW. The fast one serves those who stop for half an hour, the slow one serves staff and longer stays.

What the site needs

Fast charging requires dedicated capacity with reserve. We calculate the load for the specific site and report what has to be done to the power supply.

Read in detail →

Charging turns an ordinary car park into a modern one.

Why a car park needs it

Having charging sets a car park apart from the neighbouring ones: electric car drivers choose the place where they can leave the car on charge. For a commercial car park that justifies a higher rate.

What is required

Alternating current stations connect to the car park's existing capacity. We inspect the main panel and calculate how many stations fit without rebuilding the power supply.

How payment works

The driver pays by card through the Adele Cloud app, and the car park owner sees every transaction and the revenue in the dashboard. No cashier and no cash needed.

Green building certification

International green building standards — LEED and BREEAM — take charging infrastructure into account: electric vehicle charging earns credits in certification. Kazakhstan has its own standard, OMIR. If a building is going to be certified, charging stations are planned in from the start — we help with the power calculation and equipment selection at that stage.

Read in detail →

Charging in a business centre is a matter of status and tenant convenience.

A fast station is not the answer here

If visitors and staff leave their cars all day, a single fast charger in the car park makes little sense: one car occupies it for eight hours while others wait.

A panel with breakers indoors

We bring a panel with breakers into the building and connect two to four slow stations to it first. As usage grows we add more, without rebuilding the incoming supply.

The same for office buildings

In buildings where staff work all day, around eight hours, the approach is the same: several slow stations on a dedicated panel instead of one fast charger.

Read in detail →

A guest with an electric car picks the hotel where they can charge.

Why a hotel needs it

A traveller in an electric car plans the route around charging. They will choose the hotel that has it and skip the one that does not. For a hotel this is a visible argument at booking time.

What is required

Overnight charging fits within the building's existing capacity. We inspect the electrical panel, calculate the spare power and propose a solution without costly rebuilding.

How payment works

The guest pays by card through the app, and the hotel sees the revenue in the dashboard. Charging can be made free for guests — the platform supports that mode too.

Green building certification

International green building standards — LEED and BREEAM — take charging infrastructure into account: electric vehicle charging earns credits in certification. Kazakhstan has its own standard, OMIR. If a building is going to be certified, charging stations are planned in from the start — we help with the power calculation and equipment selection at that stage.

Read in detail →

A hub is a point on a highway where cars do not stand for long. Only fast stations work here.

Slow charging makes no sense at a hub

A hub is a point on a highway or a junction that drivers stop at on the way. The car does not stand there long, so slow stations do not pay off: nobody will wait several hours.

Fast and ultra-fast only

For hubs we install direct current stations from 60 kW upwards. The shorter the stop, the higher the throughput of the point and the more cars it serves per day.

Split systems with power sharing

The best solution for a hub is a split system: one power unit distributes capacity between several dispensers. If one car charges at full power, the others receive less, but nobody waits in a queue.

Read in detail →